Of course the process of connecting newly electrical installations (built houses) in different cities, provinces, regions may differ in some points, but nevertheless the general principle is the same. After receiving the documents confirming the ownership of land and building, the consumer is applying for inclusion. The application normally except the address and the origin of the applicant indicated the required power, voltage level, and sometimes you want to distribute power-type loads, separately indicate the presence of elektrotopleniya. Completing the application the crucial moment and the future user must first prepare for it. Depending on the number of rooms and floor space, number and capacity, often used for power consumers need to determine the quantity of installed capacity. The energy-supplying organizations can apply penalties to consumers who connect the power that exceeds the allowed contract (appearing later from these technical terms). Consumers, hampering the definition of this power is better to turn to professionals (design organization, an electrician friend, for example). In response to a request or a power supplying TCO for a month will give the consumer response (specifications, failure). Technical specifications - a document that defines the requirements that must be done to enable consumers to connect to the electricity grid. Usually, standard conditions (installation of meter, UST, obtaining permits from the concerned organizations), but sometimes may require the construction of the line, replace the wires and even the installation of new transformer stations. But this is not the worst thing possible and in fact the rejection of the connection. Disclaimer - sound disagreement connect new electrical installations to the existing power grid. Since the energy supplying organization is required to provide electrical energy corresponding to the applicable standards and regulations, and electrical networks are worn out and fully loaded and possible rejection of connection. Output or to insist on obtaining technical conditions with the installation of TP, construction lines, etc. The next step is present in different forms and not always. With technical specifications of a consumer goes to the project organization and order a draft or draft-drawing of the future electrical installations. Some of the TCO, the energy supplying organization (EO) do not require this. The project defines the electrical installation: location of switches, sockets, light fixtures, brand and cross-section of conductors, grounding device, scheme ASP and more. The project organization is implementing the project, based on the desires of the customer, according to existing rules and regulations. In any case, appeal to such an organization will protect consumers from possible disagreements with the inspection bodies (and he will have 3.2 checking prior to commissioning). The project is implemented within 1-2 weeks, and agreed with the TCO and Rostekhnadzor. And only after that on the basis of these documents is recommended to perform installation. Consumers will mount above are often faced with the need for rewiring of electrical equipment. It is also not recommended to refer to "homegrown" professionals, because even an experienced electrician working in any factory may not be aware of modern requirements for installation. In the case of a project simply need to match mounting it (in this case, "intelligent" electrical right). Of course, it is better that installation was performed by the same organization as the design. Typically, the energy supplying organization and Rostekhnadzor requires installation of licensed organization.
No comments:
Post a Comment